LED Operations – King Power Stadium – Leicester City FC

Enabledware Providing Skilled Event Staff

Project Brief

  • To provide staff to manage and operate the perimeter LED at Leicester City’s King Power stadium.
  • Pre event media setup and testing and in game operation of advertising. 

Fulfilment

  • Enabledware staff ensure the system is operational and the contracted adverts playout.
  • System is operated following the strict Premier League and UEFA competition requirements.

Evaluation

  • Enabledware continues to manage the LED operation and testing for each matchday fixture.

PROJECT DETAILS

Client:

  • OMM
  • Leicester City FC

Equipment used:

  • FluidNext LED Control 

Need help with a project like this?

Get in touch to talk about your project needs and see how we can help.

Scroll to Top